Building remedial work (entry 1)

This first entry is about the deck that was originally built at a height above FFL and laid with a waterproof decking system as opposed to a slated deck that is drawn on the plans. The roof above needed to be supported so that the deck below could be demolished and rebuilt.




Images on Picasa:


These photos show the upper roof being supported by scaffolding while the deck below is being reconstructed.